机械及工具配件 :
机械:水磨石机(7.5KW)、高速抛光机(多功能洗地机)、吸尘吸水机、低压喷雾器;
工具配件:金刚石模块(粗、细、精三种),金刚石树脂磨片(500目、1000目、2000目、3000目)、涂水器、刮水器、地拖、低压喷雾器、黑色清洁垫、白色抛光垫;
2、 基层处理:
在施工之前,清洗、清楚地面的杂物、油污、养护剂等。采用水泥基修补砂浆修补地面的坑洞和裂缝,并养护3日。
3、 打磨地面:
3.1 对于旧耐磨地面,如果表面质量较差、粗糙:用水磨石机(7.5KW机)上安装粗金刚石模块,加水磨地面,基本磨平后,分别换细磨头,精磨头再磨地面,(以同样的工序水磨),直到待地面清洗干净后,让表面风干后,即可开始进行刷涂鼎力A组份施工。
4.2 用滚筒或喷雾器将固化剂鼎力-1均匀刷涂于地面上,涂布平均用量为10㎡/kg。如果基面较差,渗透性强,须在1-2个小时后涂刷第二遍;在涂完鼎力-1约1-2小时后(材料干燥发亮前),在地面上喷些水,湿润材料,用扫帚或地拖擦洗表面,使材料完全渗透进地面,并重复2-3次,**冲洗地面,去除表面多余的材料。
4.3 在第二天,按同样的方式刷涂鼎力-2,在材料干燥发白前,往地面洒水,润湿材料,用地拖擦洗地面,使材料完全渗透进地面,并重复2-3次
4.4在第三天,再次涂刷鼎力-2一遍。一般情况下,此时表面强度可达到要求(检验方法为:用一元硬币划地面,没有痕迹),渗透性极低,表面有较多的白的沉淀物为止。
4.5 在**一遍涂刷完毕,在材料干透变白前,用洗地机彻底清洗地面,除去表面的白的沉淀物,并用吸尘器吸净污水。
4.6 硬化剂施工完成表干后即可上人作业。7天内完成反应硬化形成坚固的表层。
5、刷涂鼎力-3:
鼎力组成施工完1天后,清洗干净地面,同时用吸尘器吸净污水,晾干后,用涂水器或白色抛光垫均匀涂刷鼎力-3一道并抛光,用量为20-40㎡/kg。同时用吸尘器吸净污水。
3.2 对于较好,光滑的新耐磨地面,可直接刷涂鼎力组
Machinery and Tool Accessories:
Equipment: terrazzo machine (7.5KW), high-speed polishing machine (multifunction washing machines), vacuum suction machine, low pressure sprayer;
Tool accessories: Diamond module (coarse, fine, fine three kinds), diamond grinding resin (500 mesh, 1000 mesh, 2000 mesh, 3000 mesh), coated with water heater, wiper, mop, a low pressure sprayer, black cleaning pad white polishing pad;
2. Primary treatment:
Prior to construction, cleaning, clear the ground of debris, oil, conservation agent. Using cement-based repair mortar repair potholes and cracks the ground, and the conservation of the 3rd.
3, grinding ground:
3.1 For the old wear-resistant surface, if surface quality is poor, rough: installation of rough diamonds module with terrazzo machine (7.5KW machine), plus water mill ground, after basic polished, respectively-for fine grinding head, grinding head regrinding ground , (in the same step mill) until until ground cleaned, allow the surface to dry, you can start brushing vigorously conduct A component construction.
4.2 with a roller or sprayer full -1 curing agent evenly brush on the ground, the average amount of coating 10 ㎡ / kg. If the base surface is poor, strong permeability, must within 1-2 hours after brushing the second time; coated finish approximately 1-2 hours after full -1 (shiny material before drying), spray some water on the ground moist material, scrub with a broom or mop the surface, the material is completely penetrate into the ground, and repeat 2-3 times, and finally rinse the floor, removing excess surface material.
4.3 The next day, in the same manner as brushing vigorously -2, pale before the material is dried, to ground watering, wetting materials, land drag scrub the floor, and the material is completely penetrate into the ground, and repeat 2-3 times
4.4 On the third day, again brushing vigorously -2 again. In general, when the surface strength can meet the requirements (test method: the ground plan with a dollar coin, no traces), low permeability, the surface has more white precipitate so far.
4.5 application is complete in the final again, in front of white material dry, thoroughly cleaned with washing machine ground, remove the white precipitate surface, and vacuum clean water.
Master 4.6 can work hardening agent after the completion of construction is dry. 7 days to complete the reaction hardened to form a firm surface.
5, brush vigorously -3:
One day after the full composition of the construction finished, clean the floor while using a vacuum cleaner water, dried, coated with water or white polishing pad evenly brushing and polishing a full -3, the amount of 20-40㎡ / kg. At the same time with a vacuum cleaner water.
3.2 For a good, smooth new wear-resistant surface, can be directly brush for their group